Urgent M90 Lug Job

The Rigging Shed was contacted by a client requiring an urgent solution to lift & remove the old crusher mainframe for an upcoming shut down onsite. These were extremely urgent and we had a very short lead time to work with. The Rigging Shed worked closely with a manufacturer and their engineering team to come…

Luffing Rope Replacements in Albany

TRS were sent CBH’s replacement ropes as they had been in storage for many years and the reels had rotted and the rope lubrication was inadequate. TRS re-lubricated the ropes and fitted them to reels suitable for the rope spoolers being used on the job. These were dispatched back to CBH in preparation for the…

FMG iron ore custome solid goods cage with door fabricated

FMG Custom Lifting Cages

Our ongoing relationship with FMG, one of the global leaders in the Iron Ore Industry, continues with another completed supply job for our client. Two 1T and four 2T WLL solid side pallet lifting cages with opening doors were manufactured, tested and certified by our team. All were fabricated to the customer’s requirements and came…

Urgent Kwinana Job for CBH

A team of 5 Rigging Shed crew members were called into Kwinana by CBH to perform an urgent job over a weekend. To complete the job on the two cranes items had to be air freighted in, with RUD G120 ICE tie down equipment used to support the booms on both cranes. This was all…

Port Hedland Job

Scope of works: The works were performed on Shiploader 6 for Pilbara Port Authority located at Utah Point in Port Hedland. We had 3 shifts allowed as part of a complete plant shutdown and The Rigging Shed’s work was the priority job. 3 Technicians performed the work, Jason Gardner- NDT Technician performing MFL Inspection and…